Latest posts
What should I ask the responsible contact about a reefer instruction conflict?
Ask who authorizes settings and whether the corrected instruction must appear on shipment paperwork.
How should I brief a relief driver or dispatcher about a reefer instruction conflict?
Provide the confirmed settings, approval contact and any temperature or alarm history.
How can I prepare to reduce problems involving a reefer instruction conflict?
Compare dispatch and shipping temperature instructions before loading and flag conflicts immediately.
How can I confirm that a reefer instruction conflict has been resolved?
Confirm written instructions agree and the reefer is operating as directed by the authorized parties.
What should I do first if the reefer instructions disagree with the bill of lading?
Contact dispatch and the authorized shipper before changing settings. Obtain a reconciled written instruction.
What should I verify before changing a reefer setting after conflicting instructions?
Compare setpoint, operating mode, product requirements and the source and time of each instruction.
What details should I send dispatch about a reefer instruction conflict?
Send both instruction sets, current setting, trailer number and any displayed alarm.
What records should I keep about a reefer instruction conflict?
Keep original and corrected instructions along with the time an authorized change was made.
What mistakes should I avoid with a reefer instruction conflict?
Do not guess a compromise temperature or change mode based on an unverified call.
How should I handle delays related to a reefer instruction conflict?
Ask dispatch to resolve the conflict promptly while maintaining the last verified instruction unless qualified direction changes it.